After the 2009 fires, new bridges needed to be fire proof.
This bridge was to provide safe access to a Park's facility. The location was remote and cranes were not an option. Consequently the design and construction sequence were a little unusual being based on only a single person being able to transport to site and assemble on site using only a small "kanga" and part use of a tractor.
Built mid 2013 by Nature Assist Construction Company.